Time Really Does Fly…

Wow.. I can’t believe it has been almost a month since my last post. There has been so much going on. The exterior walls of the winery have been set, the plumbing was roughed in, the winery drain was installed, the slabs have been poured and trusses ordered. I’ve spent the last several weekends getting the site prepped for all of that to take place so there have been some really, really long weekends. If all goes according to plan, I’ll start framing this weekend to get everything ready for roof trusses to be set on June 30th. I’m still trying to find a tractor so to say that the vineyard is overgrown with weeds right now is a serious understatement. Checkout the view of the front of the winery:

Front of Winery.

There have been lots of other pictures taken showing the progress, you can follow the links below to our photo albums which also include a time lapse video of the walls going up. It was pretty impressive to watch them being set. On Thursday, our winery door is supposed to be delivered and I can’t wait to see it. I’ll make sure to upload a picture of it to our Facebook page.

Click here for more pics of our vegetable garden.

Click here for more pics of our vineyards.

Click here for more pics of our winery.

This entry was posted in Construction, Inn, Vineyard, Winery. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>